Bulk Materials Handling
 
   
 

Dry Bulk Materials

  • Rail to Overhead Steel Bin Storage. 10/100 Ton Bins
  • Rail to Truck
  • Storage Bins to Rail or Truck
  • Storage Bins to Storage Bins
  • Storage Bins to first Floor Bagging/Warehousing/Shipping
  • Storage Bins to Mixing/Blending Plant

Liquid Bulk Materials

  • Rail to Bulk Tank Storage – Temperature Controlled
  • Rail to Tank Truck
  • Tank Storage to Truck
  • Tank Storage to Drumming-Off
  • Tank Storage to Mixing/Blending Plant
  • Mixing/Blending Plant to Finished Product Bulk Tank Storage
  • Mixing/Blending Plant to Drumming-Off
  • Liquid Bulk Tank Storage - 30,000 Gal. - Temperature Controlled
  • Liquid Bulk Tank Storage – 15,000 Gal. - Inside Ambient Temperature


Working Capacity

  • One Switch per day - Two Railcars per switch
  • Transfer - Free-flowing material - Two Railcars per day
  • Bagging - Free-flowing material - One Railcar per shift
  • Dry Bulk Storage - 10 Bins – Approx One Railcar per bin
  • Warehouse: 3000 Pallets - Bagged Materials – Currently Available
  • Outside Storage – 2 Acres – Can Pave and Fence to suit


Our Facility is located in an industrial district near downtown Buffalo, New York. We own and maintain a 900' rail lead under a siding agreement with the Norfolk Southern Corporation. We can accommodate two railcars over our inside receiving pit. Materials are belt-conveyed from the receiving pit into our basement and transferred to the bucket elevator. Then, elevated to the 4th floor and transferred to 200' belt conveyor for distribution to any one of ten separate steel bins. These bins discharge into baggers on the 1st floor or to another 200' belt conveyor in the basement for re-elevation to waiting trucks or railcars or bin-to-bin transfer.